How to edit assignment dates in Aula when Turnitin LTI settings are grayed out

When you access Turnitin Feedback Studio through the Aula LTI 1.3 integration, you may find that certain assignment dates — such as the assignment start date, due date, or feedback release date — appear grayed out in the Turnitin assignment settings. These fields are read-only in Turnitin and cannot be edited directly from within the Feedback Studio interface.

This occurs because assignment details and scheduling settings are managed primarily through your Learning Management System (LMS). To update any assignment dates, you must make the changes directly in Aula rather than in Turnitin Feedback Studio. After the changes have been saved in Aula, they will be reflected in the integrated Turnitin assignment. 

For step-by-step instructions on editing an assignment in Aula, please refer to the Aula Help Center.

Was this article helpful?
0 out of 0 found this helpful

Articles in this section